framing did not pass inspection. Part of the problem was that the front wall was too flexable so two posts were put in on either side of the door
you can see the posts go from floor to ceiling
this had nothing to do with inspection, but was a detail that had to be finished before insulation goes in
Its a flue pipe that extends from the basement to the roof
view of the pipe from the basement. A wood burning stove will be in the basement.
framed opening in the upstairs bath. My plan is to beef up the truss over the kitchen, which you can see below, to make a usable attic space
Fall view from the side of the house
this scar with pipe is the well. We got lucky with the well. Good water. At least the volume is good, no telling how it tastes